Sewer installation project

A Blacktown and Western Sydney sewer installation where new PVC pipework was laid through a yard trench and connected into the existing sewer line.

Area
Blacktown / Western Sydney
Completed
July 2026
Property
Residential house
Work done
Blocked Drains
Project photos
2 photos
New PVC sewer pipe and capped inspection riser in a deep yard trench
  1. 01Problem reportedThe customer needed new sewer pipe installed and connected into the existing sewer line at the property.
  2. 02Cause foundThe existing sewer connection needed a new section installed through the yard, with a trench opened to reach the existing line and set the new pipe at the correct fall.
  3. 03Work completedExcavated the yard, laid new PVC sewer pipe through the trench, connected the new section into the existing sewer line, installed a vertical inspection riser, bedded the pipework, and prepared the trench for backfill.
  4. 04OutcomeNew sewer pipework was installed and connected to the existing sewer line, giving the property a working sewer connection with an accessible inspection point for future checks.

Project photos

New sewer pipe install

  1. New PVC sewer pipe and capped inspection riser in a deep yard trench01
    New sewer pipework and capped inspection riser installed through a yard trench.
  2. New PVC sewer pipe running through an excavated yard trench02
    New sewer pipe laid through the excavated trench before backfill.

Talk to Scott

Need a drain checked or cleared?

Call if the drain is overflowing or backing up, or send your suburb, symptoms and access details for a call back.

Call 0472 753 487

Add photos if they help show the drain, overflow or access point.

Request help

Send the drain details

Send your suburb, which drains are backing up and any useful access details. Scott will come back to you with the next step.